Status:
- Main parachutes installed
- Drogue with pilot chute installed
- All pyro- and release systems for parachutes installed
- CO2 system for uprighting system checked and installed
- Uprighting system installed
- 5-point seatbelt system altered and done
- Seat ready for installation
- All systems still green by the main sequencer system
To-do capsule:
- Final minor elements of internal electronics
- Internal GoPro-camera installation
- Low position capsule handles addition
- 500 liter internal capsule flotation addition
- White paint and fancy labels
- James Bond suitcase for arming devices and tools
LES engine to-do:
- pressure bulk head welding and pressure testing
- final assembly
Radio to-do:
- debugging, ignition start signal interference
- main control panel checkout
Ad Astra
Kristian von Bengtson